客服热线:
广州化工城交易中心
15818465693
首页>供应>塑料原料>工程塑料>PPAZ564GPPAZ564G◎ <上一个 下一个>

单  品  价  格

最小起订货量

  • 1.00元/

    ≥25

周生
15818465693 076933214396
  • 发货地  广东 东莞市
本公司精品橱窗推荐
  • 经营模式|贸易型
  • 注册资本|150万人民币
  • 企业类型|企业单位(贸易型)
  • 主营产品|本公司经营 PC,EEA,EAA,POM,PMMA,EBA,PBT,TPV.TPU.尼龙,PC.
  • 公司地区|广东/东莞市
  • 公司荣誉| 明星产品
产品目录
  • 暂无产品目录
本公司热销排行
本页信息为东莞市樟木头千泰塑胶原料有限公司为您提供的“PPAZ564GPPAZ564G◎”产品信息,如您想了解更多关于“PPAZ564GPPAZ564G◎”价格、型号、厂家,请联系厂家,或给厂家留言。
有效期至长期有效 最后更新2018-06-03 22:18
浏览次数501

PPAZ564GPPAZ564G◎

品牌:进口 产品规格:25KG 产地:广东东莞 包装说明: CAS/标准: 运输说明: PP AZ564G PP AZ564G◎▲‘PBT 3405
▲‘TPE FA3-1101
▲‘PA66 HTN51G35HSLR
▲‘POM 900P
▲‘PPS R-7-02
▲‘PBT X4820
▲‘PA6 HP-6603
▲‘PBT X4518
▲‘PP B-M60-VH
PA66 1000
ABS HF380G
▲‘TPE 3139
▲‘POM FX-11




(1) injection: the general injection molding machine can be used, and the melting index of glass fiber reinforced PPS is 50. The technological conditions of injection are: barrel temperature, pure PPS at 280~330 C, 40%GFPPS at 300-350 C, nozzle temperature, pure PPS at 305 C, 40%GFPPS at 330 C, mold temperature at 120-180 C, injection pressure, 50-130MPA.
(2) extrusion: exhaust exhaust extruder. The process is as follows: the temperature of the feeding section is less than 200 degrees, the temperature of the barrel is 300-340 degrees, the connection temperature is 320-340 degrees, and the die temperature is 300-320 degrees.
(3) molding: suitable for large products, using two compression, first cooling, and then hot press. The preheating temperature of hot press is pure PPS at about 360 C 15min, GFPPS is about 380 centigrade 20min, and the pressure of mould pressure is 10~30Mpa, which is cooled to 150 DEG C.
(4) spray forming: suspension spraying and suspension spraying and dry powder thermal spraying were used to spray the PPS onto the metal surface, and then the coating was obtained by plasticizing and quenching. The coating temperature of PPS was above 300 C and kept 30min.
Drying process

Temperature: 100~105 C
Time: 3hr
2. Injection molding process
1) mold temperature: 60-80 C
2) barrel temperature: the front section: 220~260 C middle section: 290~310 C after section: 300~320 C
Nozzles: 290~300 C
3) injection pressure: 60~70Mpa4) injection speed: medium speed
5) injection time: according to the size of the parts, the mold is filled with the parts, and the basic surface cooling and setting is the best.




ABS The wall thickness of 1. products: the wall thickness of the products is related to the flow length of the melt, the production efficiency and the requirements of the use. The ratio of the maximum flow length and wall thickness of ABS melt is 190:1, this value will vary with the grade, so that the wall thickness of ABS products should not be too thin, the products need for electroplating, wall thickness is slightly thicker, to increase the adhesion of surface coatings and products. The wall thickness of this product is selected between 1.5 and 4.5mm.
Considering the wall thickness of products, should also pay attention to the uniformity of the wall thickness, are not too big, the products need for electroplating on the surface should be smooth without bump, because these parts due to electrostatic interaction is difficult to remove dust adhesion, resulting in poor fastness of coating. In addition, it is necessary to avoid the existence of the sharp angle, so as to prevent the stress concentration, so it is appropriate to use the arc for the corner of the corner and the parts of the thick and thin connection. _
2. draft: draft articles and shrinkage is directly related to the grade of different products, different shapes and different molding conditions and molding shrinkage have some differences, generally 0.3 ~ 0.6%, sometimes up to 0.4 ~ 0.8%, the product size precision molding. The demoulding slope of ABS products is considered as: the mold core part is 31 degrees along the die direction, and the cavity part is 4 (/ 1 20') along the die direction. For products with more complex shapes or letters and patterns, the deviated slope should be properly increased.
The top 3. requirements: products due to apparent smoothness of the electroplating performance have a greater impact, any tiny scar on the table view there will appear obviously in electroplating, so in addition to the requirements of any scars are not allowed on the cavity, but also the effective area to the top, the the root rod at the top out of sync is better in the process of ejecting force should be uniform.
4. exhaust: in order to prevent the occurrence of problems such as bad exhaust, molten material burn and obvious seam line in the process of mold filling, we need to set up exhaust holes or exhaust tanks which are not more than 0.04mm, so as to discharge gas generated by melting material.
5. runner and gate: in order for ABS melt to fill all parts of the die cavity as quickly as possible, the diameter of the runner is not less than 5mm, and the thickness of the gate is over 30% of the product thickness. The length of the straight part (about the part that will enter the cavity) is about 1mm. The position of the gate should be determined according to the requirements of the products and the direction of the flow of the material. For the products that need to be treated with electroplating, it is not allowed to exist on the adhesion surface of the coating.
Raw material preparation


LLDPE The most common method of production of PE is through slurry or gas processing, and a few are processed by solution. All these processes are exothermic reactions involving ethylene monomer, a- olefin monomer, catalyst system (probably more than one compound) and various kinds of hydrocarbon diluents. Hydrogen and some of the catalysts are used to control the molecular weight. The slurry reactor is usually a stirred tank or a more commonly used large ring reactor in which the slurry can be stirred. Polyethylene particles are formed when ethylene and copolymerized monomers are in contact with the catalyst. After removing the diluent, the polyethylene particles or particles are dried and added to the dosage according to the dosage to produce the granular material. The modern production line of a large reactor with a twin screw extruder can produce more than PE40000 pounds per hour. The development of the new catalyst contributes to the improvement of the performance of the new grade HDPE. The two most commonly used catalysts are Philip's chromium oxide based catalyst and an alkyl aluminum catalyst for titanium compounds. The HDPE produced by the Philip type catalyst has a medium - width molecular weight distribution, and the molecular weight distribution of the titanium - alkyl aluminum catalyst is narrow. The catalyst used in the production of narrow MDW polymers with a compound reactor can also be used to produce a wide MDW grade. For example, two series reactors that produce significantly different molecular weight products can produce Shuangfeng molecular weight polymer, which has a molecular weight distribution in the full width domain.
molecular weight


供应商信息
公司名 东莞市樟木头千泰塑胶原料有限公司 经营模式贸易型
注册资本150万人民币 公司注册时间2011
公司所在地广东/东莞市 企业类型企业单位 (贸易型)
保 证 金已缴纳 0.00
主营行业塑料原料  , 塑料原料 / 工程塑料  , 
主营产品或服务本公司经营 PC,EEA,EAA,POM,PMMA,EBA,PBT,TPV.TPU.尼龙,PC.
联系方式






© xiaohei
0相关评论

为您推荐

免责声明:
当前页为PPAZ564GPPAZ564G◎价格信息展示,该页所展示的PPAZ564GPPAZ564G◎批发价格、PPAZ564GPPAZ564G◎报价等相关信息均有企业自行提供,PPAZ564GPPAZ564G◎价格真实性、准确性、合法性由店铺所有企业完全负责。广州化工城交易中心对此不承担任何保证责任。
友情提醒:
建议您通过拨打PPAZ564GPPAZ564G◎厂家联系方式确认最终价格,并索要PPAZ564GPPAZ564G◎样品确认产品质量。如PPAZ564GPPAZ564G◎报价过低,可能为虚假信息,请确认PPAZ564GPPAZ564G◎报价真实性,谨防上当受骗。